HOW TO ASSESS ADHESIVE DOT PLACEMENT IN RIBBON PRODUCTION

Understanding the intermittent bonded ribbon production line

Equipment for producing rollable formats in optical-fiber manufacturing is supplied by Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. Buyers can evaluate the capacity of this setup against their intended product range because it is designed for 12- and 16-fiber ribbons. Its split-type construction may also influence factory space and installation requirements.




For this specific production line, the listed construction speed is 600 m/min. The process combines fiber pay-off, gathering and guiding, intermittent resin dispensing, UV-LED curing, visual monitoring, capstan pulling, and take-up. When assessing suitability, the entire process matters rather than speed alone.

Factory utilities, reel requirements, available floor space, and installation conditions should be assessed before purchase. Request the supplier’s documentation package and verify that the system matches your cable design and operating needs. Early planning for these details can reduce setup delays and make startup smoother.

Key Takeaways

  • Intended to produce rollable 12- and 16-fiber formats.
  • Listed speed: 600 m/min for this equipment.
  • Uses a split-type construction.
  • Curing, monitoring, pulling, and take-up stages are included.
  • Check utilities, reels, installation needs, and supplier documents before buying.

Intermittent Bonded Ribbon Production LineIntermittent Bonded Ribbon Production Line

Examine The Intermittent Bonded Ribbon Production Line

To create rollable IBR formats, three mold groups position fibers for the application of small adhesive dots. Mold position is adjustable by operators from 0 to 15 mm, helping produce consistent spacing and form.

Produce Rollable Fiber Ribbons With Precision Bonding

A 16-spool pay-off feeds the machine, while guide rollers with U-shaped grooves keep individual strands organized. Hard-anodized roller surfaces promote steady contact during processing. For 12F and 16F layouts, the adjustable valve setup uses 5+5+1 valves for 12 fibers or 5+5+5 for 16. Ask the supplier to verify tension control settings that suit your particular cable design.

Run 12- And 16-Fiber Configurations At Up To 600 m/min

The stated construction speed reaches 600 m/min. Pay-off reel options hold 25.2 km or 50.4 km of fiber according to the listed reel dimensions: Φ236 mm × Φ25.4 mm × 108 mm and Φ267 mm × Φ25.4 mm × 180 mm. T-type and fiber-optic take-up reels are also available for this system. Compare reel capacity with your operational requirements and expected changeover time.

Examine The Production Line’s Main Equipment And Controls

Consistent output depends on aligning tension, resin placement, and UV exposure. The system helps operators adjust settings to their cable design and fiber ribbon requirements.

Coordinate Fiber Tension, Resin Dispensing, And UV-LED Curing

Electro-pneumatic adjustment is provided for each pay-off unit. Dispensers can operate independently or in linked groups, with adhesive-dot spacing and counts configured through the interface.

Three pre-curing ovens support the mold groups ahead of UV-LED post-curing. Ask the supplier to check resin compatibility and the relevant operating conditions.

Lamp current, oven temperature, alarms, and preset lengths are displayed or managed through the Siemens PLC and touchscreen. Check the necessary cabinet and power supply arrangements before purchasing.

Stage Specification Buyer verification
Fiber tension Pay-off tension: 0.4 to 2 N with ±0.02 N; capstan tension: 50 to 500 g with ±5 g accuracy Align settings with cable requirements
Dispensing of resin Individually operated or linked units with adjustable adhesive-dot spacing and count Check interface configuration
UV-LED curing Three pre-curing ovens rated 800 W each; one post-curing oven rated 6 kW; 395 nm ± 3 nm; at least 85% cure during stable, high-speed operation Confirm resin compatibility
Monitoring Siemens S7-1200 or S7-1500 PLC; 10.4-inch touchscreen; real-time lamp current and oven temperature, alarms, preset lengths Verify cabinet and power supply requirements

Prepare Line Configuration, Installation, And Operating Conditions

Before the machine is delivered, set aside a dedicated operating area. An enclosed, clean, dry, draft-free space is needed for the optical fibre system. Keep the temperature from 15°C to 25°C, with humidity at or below 85%. These conditions help safeguard fiber equipment and maintain precision during operation.

With your facilities team, assess site utilities, available electrical capacity, cabinet space, and cable design. Nitrogen at 7 bar with 99.99% purity and compressed air at 6 bar are specified for the system. A three-phase, five-wire electrical supply rated 380 V ±10% is specified.

  • Allow space for the cabinet, components, resin, and access to service parts. Before starting the line, confirm the temperature settings and tension control.
  • Account for the specified reel size of Φ410 mm × Φ50.8 mm × 391 mm. The take-up unit supports reels weighing up to 30 kg.
  • Account for the main power feed-in cable when preparing the site. Connection cables and cable trays are not included with the equipment.

The supply scope, reel types, and installation needs should be checked before placing an order. Reviewing these items may reduce setup time and avoid subsequent delays. Request supplier confirmation of suitable settings for your fiber and cable design, including lamp accuracy and operating conditions. Clear planning supports a smoother startup for the production system.

Request Pricing For A Ribbon Production Solution Tailored To Your Needs

At its stated speed of 600 m/min, this line can be considered by manufacturers producing rollable 12- or 16-fiber formats. When requesting a quote, provide your fiber layout, output goals, cable requirements, reel preference, and factory conditions.

Confirm that the proposed system includes the 16-spool pay-off, UV-LED curing arrangement, take-up capacity, and relevant options. Examine the supplied components, dispensing-head options, unit functions, and cable design prior to ordering.

The documentation list includes operating and maintenance manuals, a general layout drawing, electrical schematics, and a wear-parts list. Reviewing these documents can help explain setup time and future service requirements.

For pricing and configuration details matched to your production plan and site utilities, consult Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. Before buying, check the scope of supply and replacement parts.